• THE PRELIMINARY PROJECT
  • THE MAIN PROJECT
  • PROJECT SUPERVISION
  • EXECUTION OF WORKS

The preliminary project is the first step to a solution. It is delivered in paper form and contain the following:

Project task
The first and most important step is to understand your dreams or needs.A project task can be a word, sentence or a request for offer on 10 pages which represents your feelings and image of space as you see it in a few years.A project task can be defined by story, photo,catalog or emotion. It is important to be honest with yourself when it comes to private spaces or very rational when it comes to business spaces.

Draft approved
The draft approved is the project task transformed into a draft.The draft may be submitted on paper or on screen, it is important that represent something desired.The draft approved is not the final look of the interior. It can and sometimes must be changed before the start of work on the main project. It is important to be a picture frame of your interior.

Current state
The current state is the state found in your space (apartment, house, local ...) with actual purpose of the surface and the position of the rooms, walls, windows, doors, electricity, water... It is subject to changes due to the better organization of the same space, new design, better functionality or change of purpose of the space.In order to develop this part of the project which should determine the exact surface, dimensions and details of the space, it is necessary to submit a floor plan (base) of space (current state) printed or in digital form, otherwise the architect go on the field and take appropriate measurements on the spot.

Projected state
After it was finished the part of the project of current state, it starts with the development of the projected state in which are established above-mentioned parts of the current state (exact surface,dimensions,perceiving the details).At this point we determine which interventions are possible in the space. Next comes the development of the part of project that contains the new situation (new purpose of the surface, new positions of the rooms, walls, doors ...) where architect creates the space more functional as possible,taking into account your needs and desires.

Disposition of furniture and purpose of the rooms
This part of the project could not be done without new projected state (new purpose of the surface, new positions of the rooms, walls, doors ...) because it is the basis for developing the disposition of furniture and purpose of the rooms. At this stage of the design architect basically distributes furniture (with precise descriptions and dimensions) knowing exactly what is the purpose of each room and what each of them should contain. Very important part of the project because it is the basis for entering into elaboration of the final part of preliminary project, which will finally capture the complete picture of your space.

Sections a-a,b-b,c-c,d-d
The sections represent the view of the two-dimensional space. They are presented in the transverse and longitudinal variations. This allows that the space is seen „from the side“. In this way we solve all the things we cannot live in a visual format, such as: visualization of the walls,height of the space, solution of the ceiling, lighting ... and also the appearance of furniture which is described in detail and dimensioned.

3D modeling
3D modeling or perspective view of the interior is a final display of your space. Through 3D models (photo - realistic view) we can see exactly how it will look your new-designed space (apartment, house, local ...). This shows the most representative room of your interior. If it is the preliminary project of the house,for example,it will be the view of the living room, the exterior view and the view of the bathroom. If it is only one room, such as a living room, then it will be shown a room from three corners,where we can see a complete furniture,wall colors,manufacture of floors, lighting, decoration... The same would be for the preliminary project of the bathroom.With this part of the project architect presents the final idea of the new interior.

The main project involves going out into the field to record the current situation and taking measurements on the spot.The complete measurement of the current state of space. Taking all necessary measurements (height, length, width of rooms, the dimensions of the walls, all openings ...) in order to develop the current state of the project.Optionally,we can even take pictures of the space if there are specific details.

Current state
The current state is the state found in your space (apartment, house, local ...) with actual purpose of the surface and the position of the rooms, walls, windows, doors, electricity, water... It is subject to changes due to the better organization of the same space, new design, better functionality or change of purpose of the space.In order to develop this part of the project which should determine the exact surface, dimensions and details of the space, it is necessary that architect go on the field and take appropriate measurements on the spot.

We demolish and we bulid
Before we start with the development of new projected state, we examine the possibility of moving, masonry and building in the interior. With the moving of the partition walls, we get the space more functional as possible (we can increase or decrease square meters of rooms, move the doors, widen the corridor etc.) depending on your needs and, of course, how much intervention allows the interior.

Projected state
After it was finished the part of the project of current state, it starts with the development of the projected state in which are established above-mentioned parts of the current state (exact surface,dimensions,perceiving the details).At this point we determine which interventions are possible in the space. Next comes the development of the part of project that contains the new situation (new purpose of the surface, new positions of the rooms, walls, doors ...) where architect creates the space more functional as possible,taking into account your needs and desires.

Disposition of furniture and purpose of the rooms
This part of the project could not be done without new projected state (new purpose of the surface, new positions of the rooms, walls, doors ...) because it is the basis for developing the disposition of furniture and purpose of the rooms. At this stage of the design architect basically distributes furniture (with precise descriptions and dimensions) knowing exactly what is the purpose of each room and what each of them should contain. Very important part of the project because it is the basis for entering into elaboration of the final part of preliminary project, which will finally capture the complete picture of your space.

Sections a-a,b-b,c-c,d-d
The sections represent the view of the two-dimensional space. They are presented in the transverse and longitudinal variations. This allows that the space is seen „from the side“. In this way we solve all the things we cannot live in a visual format, such as: visualization of the walls,height of the space, solution of the ceiling, lighting ... and also the appearance of furniture which is described in detail and dimensioned.


Manufacture of floors
An integral part of project documentation where we inscribe a type of floor coverings that will be used in the interior with the exact square meters and given descriptions (parquet, ceramics, decking, epoxy ...).

Manufacture of walls
An integral part of project documentation where we incribe a type of wall coverings that will be used in the interior with the exact square meters and given descriptions (acrylic paint, polydisperse, ceramics, wall technique, plaster ...).

Manufacture of ceiling
An integral part of project documentation where we inscribe a type of ceiling coverings with the exact square meters and given descriptions which will be used in the interior (plaster ceiling, mineral ceiling, paneling, acrylic paint, polydisperse ...). If it's false ceiling,we add also the executive part of the project documentation required for performer of the work.

Distribution of electrical power
The complete executive part of the project (strong and weak current) which implies the exact position of lighting on the ceiling and on the walls along with the circuits, the position of the switches or dimmer switches and sockets with detailed descriptions and suggestions for selecting the manufacturer and the design of switches and sockets.

Distribution of water
The complete executive part of the project (water and sewer) which implies the exact position of the water distribution (supply and drainage ) in the bathroom and kitchen.

Manufacture of rooms
In this part of the project is presented each room separately which implies its layout and purpose with all the details (furniture, lighting, decor ...) and descriptions,cross-sections (prospects) also with all the details and descriptions.

Production drawings
The part of the project related to the interior elements that are customized, such as furniture (kitchen, wardrobes, beds ...) as well as the details which architect considers necessary for aesthetic or functional reasons (wall coverings, stairs, columns. ..). Presented in three projections with complete descriptions of used materials.

3D modeling
3D modeling or perspective view of the interior is a final display of your space. Through 3D models (photo - realistic view) we can see exactly how it will look your new-designed space (apartment, house, local ...). This shows the most representative room of your interior. If it is the preliminary project of the house,for example,it will be the view of the living room, the exterior view and the view of the bathroom. If it is only one room, such as a living room, then it will be shown a room from three corners,where we can see a complete furniture,wall colors,manufacture of floors, lighting, decoration... The same would be for the preliminary project of the bathroom.With this part of the project architect presents the final idea of the new interior.

Index
The complete content with the descriptions of used furniture, lighting, sanitary ...in the new projected interior with photos, prices and suppliers.

If you want to be sure that your project would go exactly as planned,let us take care of it. We will arrange for you all kinds of supervision-project,professional and investment supervision.

Adaptation and furnishings,as well as interior design represent an area of the construction industry that is constantly growing. Modern trends dictate the style and look of the final product and also of complete interior, therefore we try to follow the latest trends and do our best to meet the wishes of clients respecting quality standards.
Whether you need to do some of the basic operations in the field of furnishings and adaptation or you need to perform a complete renovation and interior design on a "turn-key" solution , we guarantee that all the works will be carried out well, systematically and professionally.
After creating the project, depending on the workload and the agreement with the investor, it is necessary to perform all the works in order to transform the idea of architect or investor into a real product.
During the agreement with the people who will carry out the final works of construction, before starting with the work, it is necessary to specify all the details in order to avoid possible problems later.It is necessary to define precisely what type of operations should be performed and to agree on the terms when the works should be completed.Only after these agreements, we could give the concrete price for the execution of works.
A rough division of work and procedures necessary for a complete renovation of the space can be made in three parts:
Interior design project
Execution of all necessary construction and finishing works in the field of planning
Design, manufacture of furniture and furnishings

Below we provide you with the services that can be offered:

tiler works

house painter works

plaster works

parquet works

demolition and removal of masonry

bricklayer works

electrical installations

lighting

carpenter works…